Identify the address and the authority first
Ware is in East Hertfordshire. East Herts District Council publishes solar guidance and conservation-area information for places including Ware, Great Amwell, Thundridge and Wadesmill. Use the full address to check the relevant boundary and planning history.
Hoddesdon uses Broxbourne Borough Council. An installer’s service area and a postcode prefix do not determine the planning authority. Make this check before following advice intended for a different district.
Permitted development has conditions
Some domestic rooftop solar installations can proceed under permitted-development rights, subject to the applicable conditions. Panel position, projection and the building’s circumstances matter. A neighbour’s array is not proof that your proposal follows the same route.
Check East Herts and Planning Portal guidance for the equipment and building involved. Listed buildings, conservation settings and Article 4 directions can require additional scrutiny. Ask the council which permissions or consents are needed before the installation begins.
Heritage and ownership require separate checks
A converted malting may involve both a heritage question and a shared-roof agreement. Resolve each explicitly. A freeholder’s permission does not replace planning consent, and planning permission does not give a leaseholder ownership rights over the roof.
Prepare a proposed layout, equipment details and photographs showing relevant views. Ask the installer to explain whether a different slope or arrangement could reduce visual impact while still providing useful generation. Do not assume that less visible equipment is automatically exempt.
Building control and the grid are different processes
The roof must be suitable for the proposed loading and fixings. Electrical work and building-control obligations remain relevant even where planning permission is not required. Ask who will handle the necessary notices and documentation.
The network connection process is separate again. Your installer should explain the applicable G98 or G99 route, any prior approval and any export limit. An accepted planning proposal does not itself authorise connection to the electricity network.
Keep the approvals with the installation records
Before work starts, record who is responsible for each outstanding permission or application. Keep correspondence, drawings and conditions with the final equipment specification. These records can matter when arranging maintenance, selling the property or changing equipment.
Ware Solar offers information and installer introductions. Your council determines planning matters and your chosen installer provides the technical proposal. Use our enquiry form to describe any designation or ownership issue so it can be considered at the survey stage.
Sources and further guidance
- East Herts: solar panels and planning
- East Herts: conservation areas
- Planning Portal: domestic solar planning rules
- UK Power Networks: solar, storage and EV connections
Checked 8 September 2026. Confirm current requirements with the relevant provider or authority.